Finishes are dependent on early planning

You only get one chance to rough in an item. If you discover something needs to be moved at the end of the project, chances are, framing members, insulation, or costs of patching will prevent you from moving it. We plan rough-ins based on final product specifications such as these electric meter, disconnect, and solar panel boxes. When the boxes arrive on site the rough-ins allow the boxes to be evenly spaced and centered on the section of wall.

Meter layout Zoomed with Dimensions.jpg